5-Year Workmanship Warranty • Turnkey Fit-Out

Bathroom Renovation & Installation Dublin

Transform tired bathrooms, en-suites, and downstairs cloakrooms into modern, leak-proof spaces. Our master plumbers coordinate every stage of your bathroom installation—from strip-out, concealed first-fix pipework, and tanking to high-pressure shower pumps and precision sanitaryware installation.

No Hidden Charges
Fixed Upfront Price
5-Year Guarantee
Fast Response • Free Assessment

Get Your Fixed Quote Today

Pre-selected for Full Bathroom Renovation

Step 1 of 425% Completed

What type of service do you need?

Quick Overview & Pricing Guide

A complete bathroom installation in Dublin typically takes 5 to 10 working days and includes strip-out, first-fix pipework, waterproof tanking, tiling, Stuart Turner pressure pump integration, and sanitaryware commissioning. Every renovation is backed by our 5-year plumbing workmanship guarantee.

What's Included in Our Bathroom Renovation & Installation Dublin Service

  • Complete strip-out and licensed waste disposal of old fixtures and tiles
  • First-fix concealed pipework, soil stack modifications, and linear floor drains
  • Full waterproof membrane tanking for walk-in showers and wet rooms
  • Stuart Turner Monsoon booster pump installation for high-pressure showers
  • Wall-hung vanity units, concealed cistern toilets, and thermostatic mixer showers
  • Heated towel rails, LED mirror wiring coordination, and silicone sealing

Need Urgent Advice or Same-Day Dispatch?

Speak directly with our RGI engineering desk or fill in the 60-second quote calculator at the top of this page.

Our 4-Step Engineering Process

1

Home Survey & Water Pressure Audit

We measure your bathroom layout, inspect hot-press pump capacity, and provide a fixed itemised quote.

2

Strip-Out & Waterproof Tanking

We remove old tiles and fixtures, re-route hot/cold/waste pipes, and tank all wet zones against moisture.

3

Tiling & Second-Fix Sanitaryware

Following floor and wall tiling, we fit your shower enclosure, bath, basins, taps, and concealed cisterns.

4

Pressure Testing & 5-Year Sign-Off

We pressure-test all hot, cold, and waste connections and hand over a spotless, ready-to-use bathroom.

Frequently Asked Questions

How long does a full bathroom renovation take in Dublin?

Most family bathrooms and en-suites take between 5 and 8 working days from strip-out to final handover, depending on tile format and structural plumbing changes.

Can you fix weak shower water pressure during a bathroom refit?

Yes. Many Dublin homes have gravity-fed attic tanks that deliver low pressure. We install brass-bodied Stuart Turner Monsoon twin-impeller pumps or convert your system to mains/combi pressure for powerful rainfall showers.

Can I supply my own tiles and bathroom suite?

Yes. We are happy to either provide a complete supply-and-fit package or carry out the full mechanical plumbing, tanking, and installation using sanitaryware and tiles you have sourced yourself.

No Hidden Charges • Upfront Fixed Pricing

Ready to Book Your Bathroom Renovation & Installation Dublin?

Complete our quick online form for a fast callback and fixed price quote, or call our 24/7 dispatch line right now.